Specification: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
m (Dictionary clean-up: identifier → urn:mrn:iala:dic:7-5-0400) |
||
| (One intermediate revision by one other user not shown) | |||
| Line 1: | Line 1: | ||
'''7-5- | '''urn:mrn:iala:dic:7-5-0400''' | ||
That part of the Contract Documents which details standards of workmanship, quality of materials, etc., and which, read in conjunction with the contract drawings, give a full description of the works. | That part of the Contract Documents which details standards of workmanship, quality of materials, etc., and which, read in conjunction with the contract drawings, give a full description of the works. | ||
Latest revision as of 10:00, 17 September 2026
That part of the Contract Documents which details standards of workmanship, quality of materials, etc., and which, read in conjunction with the contract drawings, give a full description of the works.
Please note that this is the term as it stands in the original IALA Dictionary edition (1970-1989)