Double topping lift: Difference between revisions

From International Dictionary of Marine Aids to Navigation
Jump to navigation Jump to search
m (1 revision)
m (Dictionary clean-up: identifier → urn:mrn:iala:dic:8-3-0045)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:


'''8-3-045
'''urn:mrn:iala:dic:8-3-0045'''


A double installation which takes the weight of a derrick and its load. It also eliminates the need for slewing guys.
A double installation which takes the weight of a derrick and its load. It also eliminates the need for slewing guys.
Line 9: Line 9:
[[Category:8.3 Equipment]]
[[Category:8.3 Equipment]]
[[Category:Alphabetical Index]]
[[Category:Alphabetical Index]]
[[Category:Category:IALA Dictionary 1970-89 Edition]]
[[Category:IALA Dictionary 1970-89 Edition]]

Latest revision as of 08:41, 17 September 2026

urn:mrn:iala:dic:8-3-0045

A double installation which takes the weight of a derrick and its load. It also eliminates the need for slewing guys.




Please note that this is the term as it stands in the original IALA Dictionary edition (1970-1989)