Initial Operational Capability (IOC): Difference between revisions

From International Dictionary of Marine Aids to Navigation
Jump to navigation Jump to search
No edit summary
m (Dictionary clean-up: identifier → urn:mrn:iala:dic:15-1-0004; section 10.1 → 15.1 Satellite Positioning and Timing (Chapter 15 Radionavigation Services))
Line 1: Line 1:
'''urn:mrn:iala:dic:15-1-0004'''


Operational status of a GNSS or other radio-navigation system declared by the providing authority, when the system is considered usable, but before validation has been fully completed.
Operational status of a GNSS or other radio-navigation system declared by the providing authority, when the system is considered usable, but before validation has been fully completed.
Line 6: Line 8:


{{languages|Initial Operational Capability (IOC)}}
{{languages|Initial Operational Capability (IOC)}}
[[Category:10.1 General e-Navigation terms]]
[[Category:15.1 Satellite Positioning and Timing]]
[[Category:Alphabetical Index]]
[[Category:Alphabetical Index]]
[[Category:IALA Dictionary 2009 Edition]]
[[Category:IALA Dictionary 2009 Edition]]
[[Category:IALA Dictionary 2023 Revision]]
[[Category:IALA Dictionary 2023 Revision]]

Revision as of 09:05, 17 September 2026

urn:mrn:iala:dic:15-1-0004

Operational status of a GNSS or other radio-navigation system declared by the providing authority, when the system is considered usable, but before validation has been fully completed.


Source: Nick Ward, Vicechair, IALA e-Nav Committee, March 2009