Formwork: Difference between revisions
Jump to navigation
Jump to search
m (1 revision) |
m (Dictionary clean-up (editorial, no change of meaning): typo) |
||
| Line 2: | Line 2: | ||
'''7-6-095 | '''7-6-095 | ||
Alternative term: Shuttering | |||
Temporary boarding or sheeting used to contain concrete during pouring and setting, shaped internally to the same profile as required for the external face of the structure. | Temporary boarding or sheeting used to contain concrete during pouring and setting, shaped internally to the same profile as required for the external face of the structure. | ||
Revision as of 06:51, 17 September 2026
7-6-095
Alternative term: Shuttering
Temporary boarding or sheeting used to contain concrete during pouring and setting, shaped internally to the same profile as required for the external face of the structure.
Please note that this is the term as it stands in the original IALA Dictionary edition (1970-1989)