Oldest pages
Jump to navigation
Jump to search
Showing below up to 50 results in range #151 to #200.
- Anode efficiency of an R.F. stage (08:09, 17 September 2026)
- Artificial antenna (08:09, 17 September 2026)
- Antenna effect (08:09, 17 September 2026)
- Antenna matching unit (08:10, 17 September 2026)
- Angular resolution (08:10, 17 September 2026)
- Anti-clutter gain control (08:10, 17 September 2026)
- Anti-vibration mountings (08:10, 17 September 2026)
- Armature (08:10, 17 September 2026)
- Asynchronous motor (08:10, 17 September 2026)
- Armour (of a cable) (08:10, 17 September 2026)
- Angle section (08:10, 17 September 2026)
- Arris (08:10, 17 September 2026)
- Ashlar (08:10, 17 September 2026)
- Anodising (08:10, 17 September 2026)
- Asbestos (08:10, 17 September 2026)
- Angle of internal friction (08:10, 17 September 2026)
- Atterberg limits (08:10, 17 September 2026)
- Archaeology (08:10, 17 September 2026)
- Articulated beacon (08:10, 17 September 2026)
- AtoN provider (08:10, 17 September 2026)
- Automatic light vessel (08:10, 17 September 2026)
- Backing (08:11, 17 September 2026)
- Backing anchor (08:11, 17 September 2026)
- Axis (of a fixed lens) (08:11, 17 September 2026)
- Ballast Lamp (08:11, 17 September 2026)
- Ballast (08:11, 17 September 2026)
- Bake buoy (08:11, 17 September 2026)
- Aural masking (08:11, 17 September 2026)
- Aural critical band (08:11, 17 September 2026)
- Back lobe (08:11, 17 September 2026)
- Automatic noise limiter (08:11, 17 September 2026)
- Automatic gain control (08:11, 17 September 2026)
- Automatic frequency control (08:11, 17 September 2026)
- Automatic direction finder (08:11, 17 September 2026)
- Bad-bearing sector (08:11, 17 September 2026)
- B-display (08:11, 17 September 2026)
- Azimuth-stabilised P.P.I. (08:11, 17 September 2026)
- Back echo (08:11, 17 September 2026)
- Availability (qualitative) (08:11, 17 September 2026)
- Availability (quantitative) (08:11, 17 September 2026)
- Automatic control (08:11, 17 September 2026)
- Automatic operation (08:11, 17 September 2026)
- Automation (08:12, 17 September 2026)
- Automatic control system (08:12, 17 September 2026)
- Automatic sequence control (08:12, 17 September 2026)
- Backlash (08:12, 17 September 2026)
- Axial thrust (08:12, 17 September 2026)
- Automatic self-starting generator set (08:12, 17 September 2026)
- Auto-transformer starting (of an a.c. motor) (08:12, 17 September 2026)
- Auxiliary contact (08:12, 17 September 2026)