Quiescent Load: Difference between revisions
Jump to navigation
Jump to search
(New Term) |
m (Dictionary clean-up: identifier → urn:mrn:iala:dic:14-5-0001; section 6.8 → 14.5 Power Systems (Chapter 14 Marine AtoN Design and Delivery)) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
'''urn:mrn:iala:dic:14-5-0001''' | |||
Quiescent load is the power requirement of a piece of equipment which is idle, listening or monitoring. | Quiescent load is the power requirement of a piece of equipment which is idle, listening or monitoring. | ||
| Line 6: | Line 8: | ||
Source: ENG7, Guideline G1067-1 (2017) | Source: ENG7, Guideline G1067-1 (2017) | ||
{{languages| | {{languages|Quiescent Load}} | ||
[[Category: | [[Category:14.5 Power Systems]] | ||
[[Category:Alphabetical Index]] | [[Category:Alphabetical Index]] | ||
[[Category:IALA Dictionary 2018 Revision]] | [[Category:IALA Dictionary 2018 Revision]] | ||
[[Category:Approved by Council through approval of source document]] | [[Category:Approved by Council through approval of source document]] | ||
Latest revision as of 09:38, 17 September 2026
Quiescent load is the power requirement of a piece of equipment which is idle, listening or monitoring.
Transceivers generally have different load profiles when transmitting and when listening. Charge controllers typically consume more power during the day when the power electronics are energised, than at night or when the battery is fully charged.
Source: ENG7, Guideline G1067-1 (2017)