ARM - 21


Date: 20/10/2025 to 24/10/2025
Venue: IALA HQ

Download multiple documents

If you would like to download multiple files at a time you can either tick the checkbox next to each document and click the "Download" button or click "Download All". Both buttons are located under the table of results.

Total number of documents

This meeting contains 71 documents.

Agenda No. Title Date
1.2 1. Introduction
Document title: ARM21-1.2.1 Provisional Agenda
Originator: Secretariat
10 Oct 2025
1.4 1. Introduction
Document title: ARM21-1.4.1 Programme for the week
Originator: Secretariat
10 Oct 2025
2.1 2. Review of action items
Document title: ARM21-2.1 ARM20 Action Items
Originator: Secretariat
26 Jul 2025
3.2 3. Reports from other bodies
Document title: ARM21-3.2.1 Report on MSC110
Originator: Secretariat
05 Sep 2025
3.2 3. Reports from other bodies
Document title: ARM21-3.2.2 Report on NCSR 12 v2
Originator: Secretariat
05 Sep 2025
3.4 3. Reports from other bodies
Document title: ARM21-3.4.1 IALA Report on ITU-R WP5B meeting 29 April to 8 May 2025
Originator: Secretariat
05 Sep 2025
6.1 6. Review of input papers
Document title: ARM21-6.1.2 ARM20 Working paper list
Originator: Secretariat
26 Jul 2025
6.1 6. Review of input papers
Document title: ARM21-6.1.1 Input Paper List
Originator: Secretariat
17 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.1 ICAO circular on water aerodrome
Originator: Secretariat
05 Sep 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.1.1 ICAO circ364 water aerodrome
Originator: ICAO
05 Sep 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.2 LN to ARM on AIS Model Course (VTS58-12.3.1)
Originator: VTS58
08 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.4.2 Overview AIS model course_v3.0
Originator: WWA
30 Sep 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.4 Model Course on AIS Data Management
Originator: WWA
14 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.4.1 AIS Data management Model course template_v2.0
Originator: WWA
30 Sep 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.5 LN to VTS, ARM and ENG on operational IALA MCP instance (DTEC5-15.2.3)
Originator: DTEC5
10 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.6 LN to ARM, ENG, VTS on Update of Emerging Technology Review (DTEC5-15.3.1)
Originator: DTEC5
10 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.7 LN to ARM, ENG, VTS on Draft Discussion Paper on IALA Vision Towards Digitalization (DTEC5-15.3.4)
Originator: DTEC5
10 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.8 LN to all committees on AI Guideline G1178 (DTEC5-15.3.5)
Originator: DTEC5
10 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.8.1 Revised G1178 An introduction to AI in IALA Domain (DTEC5-15.3.5.1)
Originator: DTEC5
10 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.9 LN to all committees on Digitalisation of Waterways Guideline (DTEC5-15.3.7)
Originator: DTEC5
10 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.9.1 Draft Guideline on Digitalization of waterways (DTEC5-15.3.7.1)
Originator: DTEC5
10 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.10 Designing an Optimized AIS Data Pipeline
Originator: Secretariat
14 Oct 2025
6.2 6. Review of input papers
Document title: ARM21-6.2.11 LN from ENG to ARM on AtoN for SIDS project (ENG21-9.2.1.1)
Originator: ENG21
17 Oct 2025
7.1 7. Introducing WG1 - Navigational requirements
Document title: ARM21-7.1.1 Proposal on the update of IMO Model Course 7.03 - OOW
Originator: China MSA
30 Sep 2025
7.3 7. Introducing WG1 - Navigational requirements
Document title: ARM21-7.3.1 Liaison note to ARM on MASS Recommendation (ENG20-9.2.2.2)
Originator: ENG20
05 Sep 2025
7.3 7. Introducing WG1 - Navigational requirements
Document title: ARM21-7.3.2 LN to DTEC & ARM draft Rec on digitalization of Marine AtoN (VTS58-12.1.5)
Originator: VTS58
08 Oct 2025
7.3 7. Introducing WG1 - Navigational requirements
Document title: ARM21-7.3.3 Consistent definitions of terms between the NAVGUIDE and IALA Dictionary
Originator: China MSA
30 Sep 2025
7.3 7. Introducing WG1 - Navigational requirements
Document title: ARM21-7.3.4 LN to ARM on draft Rec on Digitalization Marine AtoN (DTEC5-15.3.6)
Originator: DTEC5
10 Oct 2025
7.5 7. Introducing WG1 - Navigational requirements
Document title: ARM21-7.5.1 Chapter on marking test of area for Marking Different Restricted Areas
Originator: China MSA
30 Sep 2025
7.7 7. Introducing WG1 - Navigational requirements
Document title: ARM21-7.7.2 LN to ARM - VTS response on Drone Guideline (VTS58-12.2.1)
Originator: VTS58
08 Oct 2025
7.7 7. Introducing WG1 - Navigational requirements
Document title: ARM21-7.7.1 LN to ARM on G1185 OREI (VTS58-12.1.3)
Originator: VTS58
08 Oct 2025
7.7 7. Introducing WG1 - Navigational requirements
Document title: ARM21-7.7.1.1 Draft G1185 Enhancing the safety around OREI (VTS58-12.1.4)
Originator: VTS58
08 Oct 2025
8.4 8. Introducing WG2 - Information services and portrayal
Document title: ARM21-8.4.1 The Alignment and Compatibility between S-201 and S-125
Originator: China MSA
30 Sep 2025
8.4 8. Introducing WG2 - Information services and portrayal
Document title: ARM21-8.4.2 Liaison note to PAP, ARM and VTS regarding MRN (DTEC5-15.2.2)
Originator: DTEC5
10 Oct 2025
8.4 8. Introducing WG2 - Information services and portrayal
Document title: ARM21-8.4.3 IHO_NIPWG_S-125_input_to IALA_ARM21
Originator: IHO NIPWG
13 Oct 2025
8.4 8. Introducing WG2 - Information services and portrayal
Document title: ARM21-8.4.4 Report of MRN task group
Originator: IG 7.1.7
13 Oct 2025
8.4 8. Introducing WG2 - Information services and portrayal
Document title: ARM21-8.4.5 Supporting Production of Basic Data for S-201 Transition Assistance
Originator: KRISO
17 Oct 2025
8.5 8. Introducing WG2 - Information services and portrayal
Document title: ARM21-8.5.2 Amendments - MS description for theMS-2 – AtoN Service
Originator: China MSA
30 Sep 2025
8.5 8. Introducing WG2 - Information services and portrayal
Document title: ARM21-8.5.1 MS AtoN
Originator: IG 7.1.14
30 Sep 2025
8.5 8. Introducing WG2 - Information services and portrayal
Document title: ARM21-8.5.1.1 draft IALA_ms2_maritime_service
Originator: IG 7.1.14
30 Sep 2025
9.1 9. Introducing WG3 - Risk management
Document title: ARM21-9.1.1 Maritime Hydro-Meteo Fusion Index (MHFI)
Originator: MMU
30 Sep 2025
11.1 11. Summary of output and working papers
Document title: ARM21-11.1.1 New draft Recommendation on MASS post approval
Originator: ARM21
17 Nov 2025
11.1 11. Summary of output and working papers
Document title: ARM21-11.1.2 LN from ARM to all commitees on NAVGUIDE 2027
Originator: ARM21
17 Nov 2025
11.1 11. Summary of output and working papers
Document title: ARM21-11.1.3 Drone Operation for Marine Aids to Navigation and VTS Infrastructure Management
Originator: ARM21
17 Nov 2025
11.1 11. Summary of output and working papers
Document title: ARM21-11.1.4 LN from ARM to VTS on the revision of G1185 Enhancing the safety of OREI
Originator: ARM21
17 Nov 2025
11.1 11. Summary of output and working papers
Document title: ARM21-11.1.4.1 Draft G1185 Ed2.0 Enhancing the safety around OREI V3 with comments and tracks to forward as WP
Originator: ARM21
17 Nov 2025
11.1 11. Summary of output and working papers
Document title: ARM21-11.1.5 Task Proposal Revision of G1054 Preparing for An IMO Audit on AtoN Service Delivery
Originator: ARM21
17 Nov 2025
11.1 11. Summary of output and working papers
Document title: ARM21-11.1.6 AtoN for SIDS Task Description
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.4 Liaison note to DTEC on G1178
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.5 LN to VTS DTEC ARM and ENG on MSAtoN post plenary
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.5.1 Draft_Guideline_IALA_ms2_maritime_service
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.6 G1087 Ed4.0 Procedures for the Management of the IALA Domain under the IHO GI Registry October 2025 v2
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.8 LN to PAP and all committees on MRN
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.8.1 Draft G1143 Ed3.1 Unique Identifiers For Maritime Resources – post ARM21
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.8.2 Draft G1164 Ed1.1 Management of Maritime Resource Name Organisation Identifiers – post ARM21
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.8.3 Draft Gxxx Management of the IALA MRN namespace – post ARM21
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.1 LN from ARM to DTEC on establishing MCP instance (1)
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.2 Liaison note to DTEC on Discussion Paper On IALA Vision Towards Digitalization
Originator: ARM21
17 Nov 2025
11.2 11. Summary of output and working papers
Document title: ARM21-11.2.3 Liaison note to DTEC on digitalization waterways
Originator: ARM21
17 Nov 2025
11.3 11. Summary of output and working papers
Document title: ARM21-11.3.1 AIS Model Course Proposal
Originator: ARM21
17 Nov 2025
11.4 11. Summary of output and working papers
Document title: ARM21-11.4.1 LN to PAP on proposed amalgation and way forward on Cyber Security related tasks
Originator: ARM21
17 Nov 2025
11.4 11. Summary of output and working papers
Document title: ARM21-11.4.2 Workshop proposal on the third joint IHO IALA workshop on S-100 and 200_YB
Originator: ARM21
17 Nov 2025
11.5 11. Summary of output and working papers
Document title: ARM21-11.5.1.8 WP GXXXX_Use of the AIS in Marine Aids to Navigation Services - working draft_D5
Originator: ARM21
17 Nov 2025
11.5 11. Summary of output and working papers
Document title: ARM21-11.5.1.1 WP Draft Guideline Buoy Tender Requirements and Specification
Originator: ARM21
17 Nov 2025
11.5 11. Summary of output and working papers
Document title: ARM21-11.5.1.2 Draft Recommendation on Buoy Tender Activities and requirements_FINAL
Originator: ARM21
17 Nov 2025
11.5 11. Summary of output and working papers
Document title: ARM21-11.5.1.3 WP Buoy Tender Activities Guideline_Final Draft with pics edit_gt
Originator: ARM21
17 Nov 2025
11.5 11. Summary of output and working papers
Document title: ARM21-11.5.1.4 WP Draft guideline on Use of Simple IoT Sensors on Physical AtoN
Originator: ARM21
17 Nov 2025
11.5 11. Summary of output and working papers
Document title: ARM21-11.5.1.5 (ARM21-7.3.3) Consistent definitions of terms between the NAVGUIDE and IALA Dictionary
Originator: ARM21
17 Nov 2025
11.5 11. Summary of output and working papers
Document title: ARM21-11.5.1.6 R0126-The use of the Automatic identification system (AIS) in marine aids to navigation services - working paper
Originator: ARM21
17 Nov 2025
11.5 11. Summary of output and working papers
Document title: ARM21-11.5.1.7 WP Task 2.1.1 Draft Guideline on the marking of different restricted areas
Originator: ARM21
17 Nov 2025
12. 12. Review of session report
Document title: ARM21-12.1 Report of ARM21
Originator: Secretariat
17 Nov 2025
Download All
IALA
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

IALA complies with the General Data Protection Regulations of the EU. IALA will include a list of participants with their contact information on the website and in the report of this meeting. Any participant who wishes to remove their contact details from the participants' list should advise the Committee Secretary as soon as possible.